In a world facing water scarcity, RHC is your partner in navigating a future where every drop counts. We specialize in water resource management. We are actively involved in planning, building and improving systems for sustainable water use. Our commitment goes beyond engineering. We prioritize the long-term health of our environment and ensure equitable access to this precious resource for generations to come.
How RHC makes a difference:
Pakistan faced a historical flood in 2022 mainly due to climate change. Balochistan is the most effected province. The Government and ADB allocated $531 million for the Emergency Flood Assistance Project (EFAP), with $56.8 million specifically designated for the Balochistan Irrigation Department. A $5.99 million budget…
Project is aimed at managing floodwaters by constructing 100 small dams in all 35 districts across Balochistan. The project is funded by Federal Government of Pakistan and it is divided into 05 packages (20dams/Package).
Pakistan faced a historical flood in 2022 mainly due to climate change. Balochistan is the most effected province. The Government and ADB allocated $531 million for the Emergency Flood Assistance Project (EFAP), with $56.8 million specifically designated for the Balochistan Irrigation Department. A $5.99 million budget…
Pakistan faced a historical flood in 2022 mainly due to climate change. Balochistan is the most effected province. The Government and ADB allocated $531 million for the Emergency Flood Assistance Project (EFAP), with $56.8 million specifically designated for the Balochistan Irrigation Department. A $5.99 million budget…
Pakistan faced a historical flood in 2022 mainly due to climate change. Balochistan is the most effected province. The Government and ADB allocated $531 million for the Emergency Flood Assistance Project (EFAP), with $56.8 million specifically designated for the Balochistan Irrigation Department. A $5.99 million budget…
Project is aimed at managing floodwaters by constructing 100 small dams in all 35 districts across Balochistan. The project is funded by Federal Government of Pakistan and it is divided into 05 packages (20dams/Package).